The working of the machine is based on a direct proportionality between
the output capacity and the speed of the extraction screw.
FASE 1
Slide gate Open: load phase
up to the maximum level Hc
FASE 2
Slide gate Closed: emptying cycle
up to the level Lc
During the only-discharge phase, when the feeding slide gate is closed, the machine control microcomputer, through weight readings on the load cells and time measurements between a reading
and another, calculates the actual capacity at discharge and performs the necessary movements on the discharge device (AUGER) to set the actual capacity value equal to the required capacity value.